JINR, Dubna, Russia
11.12.2014-13.12.2014
Talks:
- R. Wischnewski: Central DAQ-Software and Architecture for HiSCORE-2014
- S. Epimakhov: MC simulations for HiSCORE-9
- S. Epimakhov: Amplitude calibration with the HiSCORE-9 array
- A. Skurikhin, V. Kozhin: New MSU DAQ
- A. Porelli: Reconstruction in HiSCORE
- V. Prosin: Tunka-HiSCORE: First year results
- L. Kuzmichev: Status of Tunka-HiSCORE array
- L. Sveshnikova: Simulation of the prototype HiSCORE 2013-2014 and 2014-2015
- R. Wischnewski: Precision Timing and Array Trigger for HiSCORE / TAIGA
- M. Tluczykont: Energy threshold minimization for the HiSCORE timing array
- M. Tluczykont: sim_score++ 2.0
- M. Tluczykont: Simulation of TAIGA telescopes using sim_telarray
- A. Grinyuk: MC simulation for IACT TAIGA
- K. Kompaniets: One channel of readout system on the basis of MAROC
- R. Mirzoyan: On TAIGA IACT
- V. Lenok: Preliminary parameters of TAIGA-IACT
- V. Samoliga: HiSCORE + IACT first steps
- A. Silaev: Telescope detector structure, PMT divider, PMT power supply (in Russian)
- M. Tluczykont: TAIGA IACT simulation
- V.Lenok: Enviroment of Tunka site
- M. Tluczykont: TAIGA IACT simulation
- M. Tluczykont: TAIGA mirrors
- Gamma-hadron separation with IACT+HiSCORE
- Quality factor of gamma-hadron separation with IACT+HiSCORE
- V. Romanov: Mechanical of Telescope – status and schedule
- N. Budnev: Tunka-HiSCORE optical station mechanic, 2014
- R. Mirgazov: Slow control system 2014
- F. Schröder: CROME – GHz measurements of air schowers
- F. Schröder: Tunka-Rex: Status and Outlook
- D. Kostunin: Tunka-Rex: Analysis results
- V. Zirakashvili: Cosmic ray PeVatrons: where are they?
- N. Budnev: Status of Tunka-GRANDE
- I. Yashin: EAS-TOP scintillation detectors – 25 years after